Please use this identifier to cite or link to this item: https://hdl.handle.net/11147/3087
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorDoğan, Sevgi Zeynepen
dc.contributor.authorErbaşaranoğlu, Bengi-
dc.date.accessioned2014-07-22T13:50:50Z-
dc.date.available2014-07-22T13:50:50Z-
dc.date.issued2011en
dc.identifier.urihttp://hdl.handle.net/11147/3087-
dc.descriptionThesis (Master)--İzmir Institute of Technology, Architecture, İzmir, 2011en
dc.descriptionIncludes bibliographical references (leaves: 105-108)en
dc.descriptionText in English;Abstract: Turkish and Englishen
dc.descriptionxiv, 162 leaves.en
dc.description.abstractCoordination is the third main function following design and construction in the building process. It is a sensitive managerial activity involving well-defined procedures and smooth flow of communication in all directions to achieve project objectives. This study builds on existing coordination theory and utilizes the four key coordination processes defined by Malone and Crowston (1994): (1) Managing shared resources (2) Managing producer-consumer relationship (3) Managing simultaneity constraints (4) Managing task/subtask dependencies. Four processes were interpreted and operationalized for the study of the e-mail data obtained from the wayfinding project coordination of new terminal building of Sabiha Gökçen International Airport. The organizational schema of the wayfinding project defined the e-mail communication analysis to be among the contractors, consultant and the design firm. Social network analysis is conducted for network centrality measures. Degree, betweenness and closeness centrality values are calculated for each project participant. There are three major findings from these analyses. First finding suggests that centrally positioned Wayfinding and Signage Design Project Contractor in the organization schema shows more coordination. Second finding suggests that task/subtask dependencies, producer-consumer relationship, simultaneity constraints and shared resources need respectively more coordination effort to manage in a wayfinding project. Third finding shows e-mail communication has a profound effect on coordination. The implications of these findings mean that companies involved in design and construction process may consider providing new approaches affecting dayto-to-day interactions depending on the power of new technological coordination mechanism.en
dc.language.isoenen_US
dc.publisherIzmir Institute of Technologyen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subject.lcshAirport buildingsen
dc.subject.lcshAirport terminalsen
dc.titleAnalyzing the communication and coordination processes in Sabiha Gökçen International Airport's new terminal building wayfinding projecten_US
dc.typeMaster Thesisen_US
dc.institutionauthorErbaşaranoğlu, Bengi-
dc.departmentThesis (Master)--İzmir Institute of Technology, Architectureen_US
dc.relation.publicationcategoryTezen_US
item.openairetypeMaster Thesis-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.fulltextWith Fulltext-
item.languageiso639-1en-
item.cerifentitytypePublications-
item.grantfulltextopen-
Appears in Collections:Master Degree / Yüksek Lisans Tezleri
Files in This Item:
File Description SizeFormat 
T000897.pdfMasterThesis5.17 MBAdobe PDFThumbnail
View/Open
Show simple item record



CORE Recommender

Page view(s)

9,204
checked on Mar 25, 2024

Download(s)

82
checked on Mar 25, 2024

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.